Choosing and planning

Building Regulations for Electrical Work: What Is Notifiable

Updated

Three kinds of electrical work in a home are notifiable under Part P of the building regulations, which means the work has to be certified as complying. Here is each kind with an example, when a new socket counts, who can sign the work off, and the certificates you should have once the electrician has finished.

Which electrical work is notifiable under Part P

The Planning Portal lists three kinds of notifiable electrical work, shown below with an example of each. Notifiable work has to be certified as complying with the building regulations, and who can certify it depends on whether your electrician is registered.

Notifiable work Example Where it applies
Installing a new consumer unit or fuse box Replacing an old fuse box with a new consumer unit Anywhere in the home
Installing a complete new circuit A ring or lighting circuit, or a new circuit for a cooker, shower or immersion heater Anywhere in the home
Altering an existing circuit Adding an extra power point or lighting point Only in special locations: the space around a bath or shower, or a room with a swimming pool or sauna heater

Replacing a fuse box, the example in the first row, costs £450 to £800 on Checkatrade’s job prices, an average of £625 excluding VAT.

Planning permission is a separate question. A house rewire does not need planning permission, but the work must comply with Part P of the building regulations, Checkatrade’s rewiring cost guide says.

Does a new socket need building regulations approval?

Adding an extra socket or lighting point to an existing circuit is notifiable only in a special location, the Planning Portal says. Regulation 12 of the Building Regulations 2010 defines a special location in England as a room with a swimming pool or sauna heater, or the space around the bath tap or shower head in a room with a bath or shower. That space runs up from the floor to 2.25 metres, or to the shower head if it is fixed higher, and out 0.6 metres from the edge of the bath or shower tray, or 1.2 metres from the shower head where there is no tray. A socket that is part of a complete new circuit is different, because the new circuit is notifiable in its own right.

Do not treat a new socket or light by a bath or shower as a small job

An extra power point or lighting point in the space around a bath or shower is notifiable even though the circuit already exists, so it needs the same sign-off and certificates as a complete new circuit.

A socket installation costs £55 to £75, an average of £65 excluding VAT, on Checkatrade’s job prices.

Worked example: an electric shower and a light by the bath

Say you want an electric shower on a new circuit of its own, plus an extra lighting point on the existing lighting circuit in the space around the bath. Both parts of the job are notifiable, for different reasons. The shower circuit is a complete new circuit, the second row of the table, and the lighting point is an alteration to an existing circuit in a special location, the third row.

So the whole job needs sign-off, not only the shower. Describe both parts when you ask an electrician whether the work is notifiable, because an answer about the shower alone leaves the lighting point out.

Who signs off notifiable electrical work

The Planning Portal says it is best to use a registered competent person, an installer registered with a competent person scheme, who can self-certify that the work complies with the building regulations. Ask about it before you agree the job.

Asking an electrician about Part P

Do this

We need a new circuit for an electric shower and an extra light by the bath. Is that notifiable under Part P, which competent person scheme are you registered with, and will you self-certify both parts?

Not this

Are you Part P?

Before you choose an electrician for notifiable work, look the firm up on the electrical competent person register at www.electricalcompetentperson.co.uk, the check the Planning Portal recommends. Among the ten Nottingham electricians we compare side by side, A4S Elite Electrical, which upgrades fuseboards across NG5, Arnold, Gedling and Mapperley, is NICEIC registered and Part P approved, and Atlas Electrical in Rise Park is a NICEIC Approved Contractor and NICEIC Part P Domestic Installer.

If your electrician is not registered

An installer who is not registered cannot self-certify notifiable work. Instead, the work must be inspected, approved and certificated by a building control body, meaning the council or a private registered building control approver, or, in England only, by an electrician registered with a third-party certification scheme, the Planning Portal says.

Certificates to get after notifiable work

Work by a registered electrician comes with two certificates. The electrician should give you a completed Electrical Installation Certificate showing the work has been tested for safety, and should arrange for you to receive a Building Regulations compliance certificate within 30 days and for the council to be notified, the Planning Portal says.

For a new consumer unit, Checkatrade’s consumer unit guide says the electrician provides an Electrical Installation Certificate and confirmation of Part P compliance once the replacement is done.

Certificates and sign-off after notifiable work

  • A completed Electrical Installation Certificate showing the work has been tested for safety
  • The Building Regulations compliance certificate, due within 30 days of completion
  • The council notified about the work, arranged by the electrician
  • For a new consumer unit, confirmation that the work complies with Part P
  • If the installer was not registered, the work inspected, approved and certificated by a building control body or a third-party certification scheme electrician

A landlord’s EICR is separate from building regulations sign-off: it is the inspection and test by a qualified person that the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 require in a privately rented home at least every 5 years.

Common questions

Do I need building regulations approval for a new socket?

Only if the socket is part of a complete new circuit, or is added to an existing circuit in a special location, which in England means the space around a bath or shower or a room with a swimming pool or sauna heater. In those cases the work is notifiable, and a registered competent person can self-certify it.

What electrical work is notifiable under Part P?

Installing a new consumer unit or fuse box, installing a complete new circuit, and altering an existing circuit in a special location are notifiable, the Planning Portal says. A complete new circuit can be a ring or lighting circuit, or a new circuit for a cooker, shower or immersion heater. An alteration means work such as adding an extra power point or lighting point, and in England the special locations are the space around a bath or shower and a room with a swimming pool or sauna heater.

Who can sign off electrical work under the building regulations?

A registered competent person, meaning an installer on a competent person scheme, can self-certify that notifiable work complies. If the installer is not registered, the work must be inspected, approved and certificated by a building control body, which is the council or a private registered building control approver, or, in England only, by an electrician registered with a third-party certification scheme.

What is an Electrical Installation Certificate?

An Electrical Installation Certificate shows that electrical work has been tested for safety, and a registered electrician should give you a completed one after notifiable work. It is separate from the Building Regulations compliance certificate, which the electrician arranges for you to receive within 30 days.

When do you get a Building Regulations compliance certificate?

Within 30 days of the notifiable work being completed, when a registered electrician did the job. The electrician arranges for you to receive the certificate and for the council to be notified. If the installer was not registered, the work is certificated instead by the building control body or third-party certification scheme electrician that inspects and approves it.

Where the figures come from